Search results  56  in 1.787 s
           
No Download/Name Doctype Lang Format Size
1 1 McNabb Street, Footscray Carpark in Melbourne, Australia References Construction (Sika at Work) English pdf 0.39 MB
1 McNabb Street, Footscray Carpark in Melbourne, Australia

Short description

FLOORING: Sikalastic®, Sikafloor®

Date: 22/06/2015
saw_Flooring_1McNabb Carpark_Melbourne_Australia_web.pdf
Download pdf

2 Bridge 233 Bunbury Australia References Construction (Sika at Work) English pdf 0.96 MB
Bridge 233 Bunbury Australia

Short description

Bridge 233 Bunbury for Main Roads western Australia

Date: 05/05/2014
804_Bunbury 233 Bridge Project.pdf
Download pdf

3 Bridge and Jetty Case Studies References Construction (Sika at Work) English pdf 0.45 MB
Bridge and Jetty Case Studies

Short description

Concrete Repair and Protection.

Date: 12/04/2012
36_09_saw_refurbishment.pdf
Download pdf

4 Bridge Deck Protection - Ningbo, China References Construction (Sika at Work) English pdf 0.27 MB
Bridge Deck Protection - Ningbo, China

Short description

Sika Waterproofing solution for Ningbo Inner Ring Road, Ningbo, China

Date: 29/10/2015
891_Bridge Deck Protection_Ningbo_China_V3.pdf
Download pdf

5 Bridge deck protection for Belton Lane Bridge, Grantham, UK References Construction (Sika at Work) English pdf 0.50 MB
Bridge deck protection for Belton Lane Bridge, Grantham, UK

Short description

Bridge deck protection

Date: 14/03/2014
702_saw_Belton Lane Bridge.pdf
Download pdf

6 Bridge Strengthening References Construction (Sika at Work) English pdf 0.36 MB
Bridge Strengthening

Short description

Sika StressHead Prestressing System.

Date: 12/04/2012
saw_bridge_strength_09_e.pdf
Download pdf

7 Bridge Strengthening Austria References Construction (Sika at Work) English pdf 0.41 MB
Bridge Strengthening Austria

Short description

Bridge Strengthening at Tauern Highway with Sika CarboDur M Plates, Kaernten, Austria

Date: 12/12/2013
32_bridge_strengthening_tauern.pdf
Download pdf

8 Bridge Strengthening with CFRP References Construction (Sika at Work) English pdf 1.50 MB
Bridge Strengthening with CFRP

Short description

Sika CarboDur, SikaWrap, Sikadur.

Date: 12/04/2012
saw_bulgaria_bridge_08_2008.pdf
Download pdf

9 Brisbane Airport Link-Waterproofing with SikaplanBrisbane Airport Link, Waterproofing with SikaplanBrisbane Airport Link - Waterproofing with Sikaplan® References Construction (Sika at Work) English pdf 0.64 MB
Brisbane Airport Link-Waterproofing with SikaplanBrisbane Airport Link, Waterproofing with SikaplanBrisbane Airport Link - Waterproofing with Sikaplan®

Short description

The Airport Link and busway project involves total 15 km of tunnelling
including the toll road (5.7 km of twin tunnels), busway tunnels and
connecting ramps, as well as 25 bridges and result in over 7 km of
new road.

Date: 21/02/2013
No4_2011_saw_Brisbane.pdf
Download pdf

10 Bypass Lungern, Switzerland References Construction (Sika at Work) English pdf 0.95 MB
Bypass Lungern, Switzerland

Short description

Bypass Lungern, Switzerland

Date: 12/04/2012
27_saw_bypass_lungern_switzerland_low.pdf
Download pdf

11 Car Park Solutions UK References Construction (Sika at Work) English pdf 0.59 MB
Car Park Solutions UK

Short description

Case Studies in UK.

Date: 21/08/2012
46_09_saw_carpark_solutions.pdf
Download pdf

12 Car Park Specified Solutions References Construction (Sika at Work) English pdf 1.20 MB
Car Park Specified Solutions

Short description

From Sika Ireland.

Date: 12/04/2012
39_09_saw_carpark_ireland.pdf
Download pdf

13 Coatzacoalcos Tunnel, Mexico References Construction (Sika at Work) English pdf 1.00 MB
Coatzacoalcos Tunnel, Mexico

Short description

Infrastructure Projects.

Date: 12/04/2012
04_saw_coatzacoalcos_tunnel.pdf
Download pdf

14 Colorado River Bridge on the Hoover Dam Bypass Project References Construction (Sika at Work) English pdf 0.40 MB
Colorado River Bridge on the Hoover Dam Bypass Project

Short description

Colorado River Bridge on the Hoover Dam Bypass Project - a composite bridge structure with a reinforced concrete deck, over steel box girders, supported on concrete piers from twin concrete rib arches.

Date: 30/05/2017
saw_05_11_hoover_dam_bypass.pdf
Download pdf

15 Composite reinforcing - Sika CarboDur® References Construction (Sika at Work) English pdf 4.25 MB
Composite reinforcing - Sika CarboDur®

Short description

M3 Hawley Bridge (United Kingdom): Composite reinforcing - Sika CarboDur®

Date: 12/12/2013
SIED_5907+Hawley+case+study.pdf
Download pdf

16 Construction/Strengthening of GFRP Structure References Construction (Sika at Work) English pdf 0.66 MB
Construction/Strengthening of GFRP Structure

Date: 12/04/2012
saw_constr_gfrp_struct_04_2005.pdf
Download pdf

17 Detailing with sikalastic liquid membrane References Construction (Sika at Work) English pdf 1.08 MB
Detailing with sikalastic liquid membrane

Short description

Detailing with Sikalastic®-621 on single ply membranes

Date: 15/05/2014
791_saw_Detailing with Sikalastic.pdf
Download pdf

18 Dmitrovskoye Shosse Bridge, Moscow References Construction (Sika at Work) English pdf 0.41 MB
Dmitrovskoye Shosse Bridge, Moscow

Short description

An important Russian Sika CarboDur Project.

Date: 12/04/2012
saw_struct_streng_05.pdf
Download pdf

19 Fast Applied Car Park Flooring System References Construction (Sika at Work) English pdf 0.87 MB
Fast Applied Car Park Flooring System

Short description

Fast Applied Car Park Flooring System, Tüffenwies, Zurich, Switzerland

Date: 12/09/2014
863_saw_Flooring_Carpark_Tueffenwies_low.pdf
Download pdf

20 Flooring for Truck Shops, Chile References Construction (Sika at Work) English pdf 0.30 MB
Flooring for Truck Shops, Chile

Date: 16/12/2014
Flooring for Truck Shops in Chile.pdf
Download pdf