Kárahnjúkar Hydroelectric Project, Iceland
yes
Kárahnjúkar Hydroelectric Project, Iceland

The project consists of a several dams and a full reservoir covering an area of 57 km².

Hydropower Plant, Central Paso Los Quilos, Chile
yes
Hydropower Plant, Central Paso Los Quilos, Chile

At the hydropower Plant “Central Paso Los Quilos” in Chile a water discharge tank showed large cracks due to ground settlement.

Hydroelectric Power: Hydroelectric Power Stations

Search results  10  in 261.6 ms
No Download/Name Doctype Lang Format Size
1 Ashod Desalination Plant, Israel References Construction (Sika at Work) English pdf 0.65 MB
Ashod Desalination Plant,  Israel

Short description

Ashod Desalination Plant, Israel

Date: 08/05/2014
saw_Ashdod Seawater Plant.pdf
Download pdf

2 Head Race Tunnel Refurbishment References Construction (Sika at Work) English pdf 0.46 MB
Head Race Tunnel Refurbishment

Short description

Head Race Tunnel at Emosson Hydroelectric Storage Power

Date: 30/01/2013
567_saw_Emosson Hydroelectric Storage Power Station, Switzerland_A3_low.pdf
Download pdf

3 Kárahnjúkar Hydroelectric Project, Iceland References Construction (Sika at Work) English pdf 1.10 MB
Kárahnjúkar Hydroelectric Project, Iceland

Short description

This is the heart of Iceland’s largest-ever industrial development; a € 1.1 billion hydroelectric power plant that took 5 years to build and required the construction of 73 km of tunnels and five dams for three reservoirs.

Date: 06/04/2017
saw-Karahnjukar Hydroelectric Project_Iceland_low.pdf
Download pdf

4 Lining of Flushing Water Tanks, Germany References Construction (Sika at Work) English pdf 0.49 MB
Lining of Flushing Water Tanks, Germany

Short description

Lining of Flushing Water Tanks Commune of Eckernförde, Germany

Date: 14/03/2014
19_10_saw_lining_of_ flushing_ eckernfoerde_germany.pdf
Download pdf

5 Potrerillos’s Hydroelectric Central References Construction (Sika at Work) English pdf 0.88 MB
Potrerillos’s Hydroelectric Central

Short description

Potrerillos, Mendoza, República Argentina.

Date: 21/08/2012
08_09_saw_potrerillos_argentina.pdf
Download pdf

6 Refurbishment of the Gabčíkovo locks on the River Danube in Slovakia References Construction (Sika at Work) English pdf 0.67 MB
Refurbishment of the Gabčíkovo locks on the River Danube in Slovakia

Short description

CONCRETE REPAIR AND PROTECTION USING: Sika® Abraroc®-SR, Sika MonoTop®-910,
Sikadur® Combiflex® SG -20 M, Sikadur®-31 CF Rapid, Sikagard®-675W Elastocolor,
SikaGrout®-311, Sika MonoTop®-412 N, Sika® Injection®-201

Date: 10/03/2015
861_saw_Gabčíkovo locks on the Danube river_Slovakia.pdf
Download pdf

7 RENOVATION HYDROPOWER PLANT, EGLISAU References Construction (Sika at Work) English pdf 0.13 MB
RENOVATION HYDROPOWER PLANT, EGLISAU

Short description

Resistant floor covering with Sika tiling system

Date: 01/02/2016
saw_Renovation_Power plant_Eglisau_Switzerland_v2.pdf
Download pdf

8 Tunnel Projects Worldwide References Construction (Sika at Work) English pdf 0.59 MB
Tunnel Projects Worldwide

Short description

Sika Tunneling & Mining

Date: 12/04/2012
saw_tunneling_mining_02.pdf
Download pdf

9 ViscoCrete Technology for Precast Concrete References Construction (Sika at Work) English pdf 0.74 MB
ViscoCrete Technology for Precast Concrete

Date: 12/04/2012
saw_precast_concprod_04_06.pdf
Download pdf

10 Waterproofing of a Water Discharge Tank, Chile References Construction (Sika at Work) English pdf 0.48 MB
Waterproofing of a Water Discharge Tank, Chile

Short description

At the hydropower Plant “Central Paso Los Quilos” in Chile a water discharge tank showed large cracks due to ground settlement. These cracks created structural problems and caused infiltration of the water to the ground.

Date: 12/04/2012
14_11_saw_waterproofing_discharge_tank_chile.pdf
Download pdf