Industrial Buildings - Factories

Thales Faclity Lithgow NSW, Australia

As a result of a severe storm the colour bond roof was torn off the facility, 4000 m² were effected. Roof Refurbishment.
Adhered Roofing System (PDF, 150 KB)

LogoThales Faclity Lithgow NSW, Australia

As a result of a severe storm the colour bond roof was torn off the facility, 4000 m² were effected. The client required the roof deck to be re-roofed to prevent the ingress of water to protect approximately 60 million dollars of precision manufacturing equipment.


The Pointe at Beaumeade Ashburn, VA

ORR Partners, LLC of Falls Church, VA was developing the Pointe at Beaumeade office building in Ashburn, VA.
Sarnafast and Décor Roof System (PDF, 320 KB)

LogoThe Pointe at Beaumeade Ashburn, VA

Sika Sarnafil’s Decor Roof System - Provides Look of Distinctive Metal Roof at Fraction of the Price.


CBA Aluminium lamination plant extension, Brazil

The largest Aluminium laminating company in Brazil, CBA, decided to expand their lamination activities. As a result, they also had to build a major extension with a floor area in excess of 20‘000m²
Wood Floor Bonding in Industrial Areas (PDF, 650 KB)

LogoCBA Aluminium lamination plant extension in São Paulo, Brazil

In 2005 the largest Aluminium laminating company in Brazil, CBA, decided to expand their lamination activities. As a result, they also had to build a major extension with a floor area in excess of 20‘000m², to their plant which is located in São Paulo. In order to achieve an increased anti-static environment inside the plant and also to create an improved working environment for the employees, CBA decided on the use of a real hardwood block parquet floor.