Rail - Railway Stations
New York Metropolitan Transit Authority #7 Line
In planning for more than 50 years, the 2nd Avenue subway line is now becoming a reality. Tunnels and stations are built.

New York Metropolitan Transit Authority #7 Line, 2nd Avenue Tunnels and StationsThe New York City Subway is one of the oldest and most extensive public transportation systems in the world, with 468 stations in operation; 229 miles (369 km) of routes.
In planning for more than 50 years, the 2nd Avenue subway line is now becoming a reality. A number of different methods will be used to tunnel for 13.7 kilometers (9 mi) underneath Manhattan, which is densely populated. 90% of the tunneling will be performed by a tunnel boring machine. The rest of it will be done using the cut and cover method and mined drill and blast, for sections, generally the 16 stations, that average 275 meters (902 ft) in length.
Waterproofing of tunnel projects of Tokyo Metro, Japan
Tunnel projects of Tokyo Metro Line 13 are one of the biggest construction projects in Japan.

Waterproofing of tunnel projects of Tokyo Metro, JapanTunnel projects of Tokyo Metro Line 13 are one of the biggest construction projects in Japan. A new metropolitan subway is extended to Shibuya Station,one of the biggest stations in Tokyo. The tunnel is constructed by dig and cast method, where waterproofing layer of 27’000 m2 in total is established prior to concrete walls.
Metro Dubai
The Largest Driverless Metro in the World with
Sika’s Concrete Technologies.

Project DescriptionThe Dubai Metro is a driverless, fully automated metro network that will already be the largest in the world, at over 70 kilometres, when the second ‘Green Line’ of the four planned lines is fully open in 2011. These first two lines that are nearing completion have elevated sections for 58.7 km and underground sections in tunnels for 12.6 km.
Network Station “Wien Mitte” Austria
The railway station Wien Mitte is very centrally located between the center of Vienna (Innenstadt) and the precinct Landstrasse.
Corrosion- and Fire Protection Renovation, PDF 1 MB
Network Station “Wien Mitte” AustriaThe railway station Wien Mitte is very centrally located between the center of Vienna (Innenstadt) and the precinct Landstrasse. With 30’000 railway passengers per day, Wien Mitte is the highest frequented railway station in Vienna. At this junction several railway lines and two underground lines (U3 and U4) intersect.
Milan Underground System
Upgrade of the underground system in Milan include the 1 km double tunnel on line M1.
M3 Dergano - Comasina, the new automatic M5, PDF 951 KB
Milan Underground SystemThe upgrade of the underground system in Milan include the 1 km double tunnel on line M1 from external city to the new exhibition area of Rho Fiera; the Dergano – Comasina 4 km tunnels on Line M3 and the construction of fully authomatic light underground line M5 on a length of 6 km.
Gotthard Railway Base Tunnel - Sections Bodio/ Faido & Sedrun
AlpTransit Gotthard is creating a flat rail link for future travel.
Gotthard Railway Base Tunnel, PDF 1 MB
Gotthard Railway Base Tunnel - Sections Bodio/ Faido & SedrunAlpTransit Gotthard is creating a flat rail link for future travel through the Alps. At the heart of the new transalpine rail route is Gotthard Base Tunnel. With a length of 57 km, the world’s longest tunnel should become operational at the end of 2016.
Light Rail Transit (LRT) Infrastructure Works Package, Putrajaya, Malaysia
Parts of the tunnel will be submerged under water.
Waterproofing of Concrete Construction, PDF 864 KB
Light Rail Transit (LRT) Infrastructure Works Package, Putrajaya, MalaysiaParts of the tunnel will be submerged under water. Sika Injectoflex System Type HP to provide an effective method of sealing construction joints against ingress of water.
New Metro Rail, Perth, Australia
Perth is experiencing a massive change to their transport infrastructure at present.
Waterproofing of Concrete Construction, PDF 864 KB
New Metro Rail, Perth, AustraliaPerth is experiencing a massive change to their transport infrastructure at present with a double track railway being contsructed from Northbridge to Mandurah. That’s 163 km of track work from the CBD to the south of the city. The construction works are broken up into two sections the new metro rail system underground in the city, and the new rail link heading south. The new Metro Rail will effectively double Perth’s rail network!










