Water - Waterways
Potrerillos’s Hydroelectric Central
The project consist in an earth dam with 1.300 hectare of reservoir.
Potrerillos’s Hydroelectric Central (PDF, 920 KB)

Potrerillos’s Hydroelectric CentralThe project consist in an earth dam with 1.300 hectare of reservoir, 116 meters high, with a central impermeable core, where the tunnel work was emphasized. The deviation tunnels and the adduction tunnels, which were 15 km long, with different diameters, were totally shotcreted with Sigunit-L22 (1.100 tons), using a robot arm. Shotcrete was also used in the hillside where we have provided with two Aliva -246 machines.



