Hoover Dam Bypass Project, Colorado River, USA
yes
Hoover Dam Bypass Project, Colorado River, USA

For the cast-in-place reinforced concrete foundations and ribs of the arch, a High Performance Concrete mix design was specified that had to achieve a compressive strength of 69 MPas (10’000 psi), together with strict limits on shrinkage and long term creep. This had to be developed and then adapted to provide consistent performance in the extreme temperature conditions, which can vary from below -20°C in winter, to higher than +40° C in summer.

 

Further Structural Strengthening References

Search results  37  in 618.9 ms
           
No Download/Name Doctype Lang Format Size
1 Bridge 233 Bunbury Australia References Construction (Sika at Work) English pdf 0.96 MB
Bridge 233 Bunbury Australia

Short description

Bridge 233 Bunbury for Main Roads western Australia

Date: 05/05/2014
804_Bunbury 233 Bridge Project.pdf
Download pdf

2 Bridge Strengthening References Construction (Sika at Work) English pdf 0.36 MB
Bridge Strengthening

Short description

Sika StressHead Prestressing System.

Date: 12/04/2012
saw_bridge_strength_09_e.pdf
Download pdf

3 Bridge Strengthening Austria References Construction (Sika at Work) English pdf 0.41 MB
Bridge Strengthening Austria

Short description

Bridge Strengthening at Tauern Highway with Sika CarboDur M Plates, Kaernten, Austria

Date: 12/12/2013
32_bridge_strengthening_tauern.pdf
Download pdf

4 Bridge Strengthening with CFRP References Construction (Sika at Work) English pdf 1.50 MB
Bridge Strengthening with CFRP

Short description

Sika CarboDur, SikaWrap, Sikadur.

Date: 12/04/2012
saw_bulgaria_bridge_08_2008.pdf
Download pdf

5 Building Rehabilitation Faculty of Law, University of Granada, Spain References Construction (Sika at Work) English pdf 0.64 MB
Building Rehabilitation Faculty of Law, University of Granada, Spain

Short description

Strengthening: Sika CarboDur®

Date: 09/03/2015
938_saw_faculty of law_granada_web.pdf
Download pdf

6 Colorado River Bridge on the Hoover Dam Bypass Project References Construction (Sika at Work) English pdf 0.40 MB
Colorado River Bridge on the Hoover Dam Bypass Project

Short description

Colorado River Bridge on the Hoover Dam Bypass Project - a composite bridge structure with a reinforced concrete deck, over steel box girders, supported on concrete piers from twin concrete rib arches.

Date: 30/05/2017
saw_05_11_hoover_dam_bypass.pdf
Download pdf

7 Composite reinforcing - Sika CarboDur® References Construction (Sika at Work) English pdf 4.25 MB
Composite reinforcing - Sika CarboDur®

Short description

M3 Hawley Bridge (United Kingdom): Composite reinforcing - Sika CarboDur®

Date: 12/12/2013
SIED_5907+Hawley+case+study.pdf
Download pdf

8 Dmitrovskoye Shosse Bridge, Moscow References Construction (Sika at Work) English pdf 0.41 MB
Dmitrovskoye Shosse Bridge, Moscow

Short description

An important Russian Sika CarboDur Project.

Date: 12/04/2012
saw_struct_streng_05.pdf
Download pdf

9 MAITENANCE OF VARIOUS MUNICIPAL STRUCTURAL WORKS IN UTRECHT, NL References Construction (Sika at Work) English pdf 0.19 MB
MAITENANCE OF VARIOUS MUNICIPAL STRUCTURAL WORKS IN UTRECHT, NL

Short description

REFURBISHMENT: Bridge, retaining wall, bascule cellar, concrete repair and protection, maintain structural work

Date: 31/05/2016
saw_Refurbishment_Maintenance Municipal Structural Works_Utrecht.pdf
Download pdf

10 Montearroyo Residential Complex Villavicencio References Construction (Sika at Work) English pdf 0.72 MB
Montearroyo Residential Complex Villavicencio

Short description

The Montearroyo Residential Complex Villavicencio, Colombia

“From the Basement to the Roof” – with Sika

Date: 12/04/2012
saw_40_10_montearroyo_colombia.pdf
Download pdf