Hoover Dam Bypass Project, Colorado River, USA
yes
Hoover Dam Bypass Project, Colorado River, USA

For the cast-in-place reinforced concrete foundations and ribs of the arch, a High Performance Concrete mix design was specified that had to achieve a compressive strength of 69 MPas (10’000 psi), together with strict limits on shrinkage and long term creep. This had to be developed and then adapted to provide consistent performance in the extreme temperature conditions, which can vary from below -20°C in winter, to higher than +40° C in summer.

 

Further Structural Strengthening References

Search results  37  in 132,7 ms
           
No Download/Name Doctype Lang Format Size
1 Post-Tensioned CarboDur CFRP Plates References Construction (Sika at Work) English pdf 0,54 MB
Post-Tensioned CarboDur CFRP Plates

Short description

Increasing Earthquake Resistance.

Date: 12/04/2012
saw_earthquak_01_2007.pdf
Download pdf

2 Prestressed CFRP Plates References Construction (Sika at Work) English pdf 0,47 MB
Prestressed CFRP Plates

Short description

Strengthening of a Sports Hall Roof.

Date: 12/04/2012
saw_prestress_plates_10_2005.pdf
Download pdf

3 Rehabilitation of Bridge Lorcia, Spain References Construction (Sika at Work) English pdf 1,06 MB
Rehabilitation of Bridge Lorcia, Spain

Short description

Refurbishment, Rehabilitation

Date: 15/07/2015
SAW-Historical-Bridge-Spain.pdf
Download pdf

4 Rehabilitation of the Bago Bridge, Negros Occidental Philippines References Construction (Sika at Work) English pdf 0,85 MB
Rehabilitation of the Bago Bridge, Negros Occidental Philippines

Short description

Strengthening: Sika CarboDur®

Date: 09/03/2015
935_saw_rehabilitation_bago-bridge_web.pdf
Download pdf

5 Rehabilitation of the Kloosterveste Center Assen, Netherlands References Construction (Sika at Work) English pdf 0,65 MB
Rehabilitation of the Kloosterveste Center Assen, Netherlands

Short description

Strengthening: Sika CarboDur®, Sika® CarboShear L

Date: 09/03/2015
934_saw_kloosterveste-center_Assen_NL_web.pdf
Download pdf

6 Rehabilitation of the Locsin Montelibano Hospital, Philippines References Construction (Sika at Work) English pdf 0,39 MB
Rehabilitation of the Locsin Montelibano Hospital, Philippines

Short description

Refurbishment, Rehabilitation

Date: 28/01/2015
SAW-Locsin-Montelibano-Hospital-Phillipines.pdf
Download pdf

7 Rehabilitation of the Ohio Missouri Historic Bridge Florida, U.S.A. References Construction (Sika at Work) English pdf 0,94 MB
Rehabilitation of the Ohio Missouri Historic Bridge Florida, U.S.A.

Short description

Strengthening: Sika Carbodur® BC Rods

Date: 09/03/2015
939_saw_ohio-missouri-historical-bridge_web.pdf
Download pdf

8 Removal of Walls References Construction (Sika at Work) English pdf 0,56 MB
Removal of Walls

Short description

Using post-tensioning with the Sika CarboStress System.

Date: 12/04/2012
saw_carbostress_13_06.pdf
Download pdf

9 Repair and Protection for Concrete & Steel Bridges References Construction (Sika at Work) English pdf 1,00 MB
Repair and Protection for Concrete & Steel Bridges

Short description

Sika Expertise Around the World:
South Africa, Germany, France, Slovakia, Hungary, Switzerland
and Poland

Date: 12/04/2012
31_10_saw_rep_prot bridge_projects.pdf
Download pdf

10 Roof strengthening of a garage roof, Switzerland References Construction (Sika at Work) English pdf 0,42 MB
Roof strengthening of a garage roof, Switzerland

Short description

Structural strengthening of a garage roof in Soazza, Switzerland

Date: 12/04/2012
15_11_saw_structural_strenghtening_garage_roof_switzerland.pdf
Download pdf