Hoover Dam Bypass Project, Colorado River, USA
yes
Hoover Dam Bypass Project, Colorado River, USA

For the cast-in-place reinforced concrete foundations and ribs of the arch, a High Performance Concrete mix design was specified that had to achieve a compressive strength of 69 MPas (10’000 psi), together with strict limits on shrinkage and long term creep. This had to be developed and then adapted to provide consistent performance in the extreme temperature conditions, which can vary from below -20°C in winter, to higher than +40° C in summer.

 

Further Structural Strengthening References

Search results  37  in 156,2 ms
           
No Download/Name Doctype Lang Format Size
1 Seismic upgrading of Buildings References Construction (Sika at Work) English pdf 0,55 MB
Seismic upgrading of Buildings

Short description

Sika Composite Strengthening Systems.

Date: 12/04/2012
saw_seismic_upgrading_05_2005.pdf
Download pdf

2 Sewage Treatment Plants Refurbishment References Construction (Sika at Work) English pdf 0,76 MB
Sewage Treatment Plants Refurbishment

Date: 20/02/2013
2013_saw_Sewage Treatment Plants.pdf
Download pdf

3 Sika footprint in Brasil Football sport venue with construction chemical materials: basement to roof solutions References Construction (Sika at Work) English pdf 2,59 MB
Sika footprint in Brasil Football sport venue with construction chemical materials: basement to roof solutions

Short description

stadium arena for football

Date: 06/08/2014
World-Cup-Stadiums-Brazil-2014.pdf
Download pdf

4 Sika footprint in Sochi Winter Games sport venues References Construction (Sika at Work) English pdf 1,71 MB
Sika footprint in Sochi Winter Games sport venues

Short description

basement to roof solutions for Sochi Winter Games stadium

Date: 04/03/2014
SAW_sochi olympic sport venue_web.pdf
Download pdf

5 Sika Solutions for the World Cup 2010 References Construction (Sika at Work) English pdf 0,69 MB
Sika Solutions for the World Cup 2010

Short description

Solutions for the 2010 World Cup Soccer Stadiums, South Africa

Date: 17/02/2016
13_10_saw_stadium_south_africa.pdf
Download pdf

6 Sika Solutions in Spanish Airports References Construction (Sika at Work) English pdf 1,15 MB
Sika Solutions in Spanish Airports

Short description

T4 Madrid Barajas (MAD): Joint Sealing
La Palma (SPC): LAM Waterproofing
Menorca (MAH): Structural Strengthening with CFRP
Santander (SDR): LAM Waterproofing
T1 Barcelona El Prat (BCN): LAM Waterproofing

Date: 30/04/2013
No39_saw_Spanish Airports.pdf
Download pdf

7 Silo Refurbishment, LafargeHolcim, Croatia References Construction (Sika at Work) English pdf 0,31 MB
Silo Refurbishment, LafargeHolcim, Croatia

Short description

Sika Solutions included repair mortars, static reinforcement, concrete protection, roof waterproofing

Date: 06/06/2017
Silo Refurbishment, LafargeHolcim, Croatia.pdf
Download pdf

8 Solutions for KRAKÓW ARENA References Construction (Sika at Work) English pdf 0,83 MB
Solutions for KRAKÓW ARENA

Short description

Roofing: Sarnafil®, Sarnafast®, Flooring : Sikafloor®, Refurbishment: Sika® Repair, Strengthening : Sika CarboDur®, Sealing : Sikadur® Combiflex® SG

Date: 14/01/2015
krakow-arena-poland.pdf
Download pdf

9 Strengthening of the first Cooling Tower References Construction (Sika at Work) English pdf 0,41 MB
Strengthening of the first Cooling Tower

Short description

...in Germany with SikaWrap Fabrics.

Date: 12/04/2012
saw_refurbish_struct_streng_02_2005.pdf
Download pdf

10 Structural Bonding at TV Tower, Stuttgart References Construction (Sika at Work) English pdf 0,51 MB
Structural Bonding at TV Tower, Stuttgart

Short description

Structural bonding with Sikadur-33 Epoxy adhesive during refurbishment of the visitors platform.

Date: 23/07/2012
saw_tv_tower_10_06.pdf
Download pdf