Hoover Dam Bypass Project, Colorado River, USA
yes
Hoover Dam Bypass Project, Colorado River, USA

For the cast-in-place reinforced concrete foundations and ribs of the arch, a High Performance Concrete mix design was specified that had to achieve a compressive strength of 69 MPas (10’000 psi), together with strict limits on shrinkage and long term creep. This had to be developed and then adapted to provide consistent performance in the extreme temperature conditions, which can vary from below -20°C in winter, to higher than +40° C in summer.

 

Further Structural Strengthening References

Search results  37  in 133,2 ms
           
No Download/Name Doctype Lang Format Size
1 Structural Retrofitting of the Krousovitis Bridge, Greece References Construction (Sika at Work) English pdf 0,63 MB
Structural Retrofitting of the Krousovitis Bridge, Greece

Short description

Strengthening: SikaWrap®

Date: 09/03/2015
933_saw_krousovitis_bridge_Greece.pdf
Download pdf

2 Sutong Bridge Project in China References Construction (Sika at Work) English pdf 0,52 MB
Sutong Bridge Project in China

Short description

The longest Cable Stayed Bridge in the World (32,4 Km).

Date: 23/07/2012
saw_sutong_bridge_07_06.pdf
Download pdf

3 Swiss Railway (SBB) References Construction (Sika at Work) English pdf 0,58 MB
Swiss Railway (SBB)

Short description

Noise Barriers using GFRP Profiles with Sikadur Structural Adhesives.

Date: 23/07/2012
saw_gfks_11_2005.pdf
Download pdf

4 Textile Reinforced Mortar System (TRM) References Construction (Sika at Work) English pdf 0,38 MB
Textile Reinforced Mortar System (TRM)

Short description

Sika Textile Reinforced Mortar System (TRM)

Date: 10/11/2016
saw_Refurbishment_Restoration of Panourgia’s house_Greece_2.pdf
Download pdf

5 The biggest sports and entertainment venue Krakow, Poland References Construction (Sika at Work) English pdf 0,83 MB
The biggest sports and entertainment venue Krakow, Poland

Short description

Roofing: Sarnafil®, Sarnafast®, Flooring : Sikafloor®, Refurbishment: Sika® Repair, Strengthening : Sika CarboDur®, Sealing : Sikadur® Combiflex® SG

Date: 20/01/2015
944_saw_Krakow Arena_Poland_web.pdf
Download pdf

6 The Kaeng Krachan Elephant House at Zurich Zoo References Construction (Sika at Work) English pdf 1,19 MB
The Kaeng Krachan Elephant House at Zurich Zoo

Short description

Sika® Systems “From Basement To Roof”

Date: 20/01/2015
910_saw_Kaeng Krachan Elephant House at Zurich Zoo_low_V2.pdf
Download pdf

7 The longest post-tensione CFRP Plate References Construction (Sika at Work) English pdf 0,41 MB
The longest post-tensione CFRP Plate

Short description

Case Study on the longest post-tensione CFRP Plate:
Audi plant in Györ (Hungary)

Date: 03/05/2012
saw_struct_streng_01.pdf
Download pdf